European Delivery Date Discrepancy
Hello all. Hope all is well.
I have decided to do European Delivery and my saleswoman stated she received word that my preliminary tentative delivery date is October 18th.
However, I called BMW today to obtain a production status update and was told that the order has been "accepted by germany" (production status 111), that the next step is "daily production pack", which takes between 2 and 3 weeks, and the step thereafter is "production", which takes between 1 and 1 and a 1/2 weeks.
Considering the longest duration for the timing left and rounding up same, I get 5 weeks from now, which takes me to September 30th, 2 and a 1/2 weeks away from the aforesaid October date.
Does anyone have any insight as to the discrepancy between the two dates? I have calls into both my saleswoman and BMW European Delivery.
Thank you!
Last edited by dbs600; 08-26-2010 at 09:04 PM..
|