Quote:
Originally Posted by lsturbointeg
next phase! bamboo flooring came in and I have them acclimating on the first floor. gonna wait 7 days so i'll probably start tackling this next Thursday on my day off! 45 cases (10per 6' lengths) =450 pieces
i'll have to start tearing up the floors in the mean time
|
If you're trying to acclimate that flooring, it should have been left in bundles and cross-stacked...and elevated from the tile. With it all stacked tight, there is gonna be a moisture content difference between the top/middle/bottom.
Do you have a meter?
What's the subfloor?? (need to check the moisture content there, as well)
(
this is all assuming a solid product with a nail down installation)
-Mark in St. Louis